Sadbhav Engineering’s – special purpose vehicle (SPV) –
Rohtak-Panipat Tollway (RPTPL) project, has achieved Commercial
Operational Date (COD) as January 06, 2014 for the entire length of
Project Highway i.e. from Km 0.000 to 80.858.
https://www.epicresearch.co/
https://www.epicresearch.co/
No comments:
Post a Comment